ALFION ALternative Fuel Implementation in IgOumeNitsa port

alfion

Project name: ALFION - ALternative Fuel Implementation in IgOumeNitsa port

Duration: 01/08/2020 – 30/11/2022

Co-funded by the European Union

Project summary

The Directive 2014/94/EU of the European Parliament and of the Council of 22 October 2014, on the deployment of alternative fuels infrastructure, defines a common framework of measures for the deployment of alternative fuels infrastructure in the European Union in order to minimize dependence on oil and to mitigate the environmental impact of transport. It sets out minimum requirements for the building-up of alternative fuels infrastructure, including infrastructure at Ports of the Core Network for electric vessels and vehicles (EV). The current lack of infrastructure for EV charging is an important obstacle to the development of the subsequent market. Public interventions stimulating the implementation of charging infrastructure for electric vessels and vehicles are therefore necessary.

Moreover, by supporting zero emission (electric vessels), especially in the Core Port of Igoumenitsa is contributing to the objectives of the European Green Deal, as set out in the Communication from the Commission COM(2019) 640 of 11 December 2019.

The Action aims at providing the necessary final studies and engineering designs for the development of on-shore power supply technology to the port of Igoumenitsa, the introduction of renewable energy sources to the power system of the port, and the necessary creation of a central power management system that will regulate the energy network of the port, maximizing the environmental and financial profits for the port and the entire area.

The overall objective of the Action is to transform Igoumenitsa port into an energy hub of the Adriatic-Ionian Sea, providing sustainable solutions based on the requirements of the maritime and vehicle traffic of the port.

Protasis scope

In the framework of the ALFION project, PROTASIS S.A. is playing a key role in the energy upgrade of Igoumenitsa's port. PROTASIS is primarily responsible for conducting the Front-End Engineering Design (FEED) studies for the Shore-Side Electricity (SSE) infrastructure, which encompass two High Voltage SSE positions (11 kV/2 MVA) and one Low Voltage SSE position (0.44 kV/0.5 MVA).

Additionally, PROTASIS is actively involved in the design of an Energy Storage System (ESS), which will enhance the optimal operation of Igoumenitsa port by managing excess electricity and serving either the utility grid or the SSE system directly.

Lastly, a sophisticated Energy Management System has been designed, relying on internal communication between the Battery Management System (BMS) of the Battery Energy Storage System (BESS) and the Control Unit of the SSE Unit. The results from this conceptual design will be used to proceed with the FEED study of the Power Management System, which will control, manage, and monitor all existing subsystems to ensure reliable operation and maximize efficiency.

Partners

  • Lead Partner: Igoumenitsa Port Authority S.A.
  • Hellenic Electricity Distribution Network Operator
  • PROTASIS SA
  • HYDRUS Engineering SA
  • National Technical University of Athens