Commissioning Services
Commissioning services for substations are critical to ensure that newly constructed or upgraded substations are properly installed, tested, and fully operational before being put into service. The existing or upgraded protection & control system of the substation includes the following key aspects:
- Planning and preparation
- Inspection and verification
- Equipment check
- Functional testing and system integration testing
- Performance testing (load testing, protection system testing, operational testing)
- Safety and compliance checks
- Training and documentation
Site Acceptance Tests
These tests ensure that the installed equipment meets the required specifications and operates correctly within the integrated system. The key steps involved in conducting a Site Acceptance Test for a substation's protection & control system are:
- Continuity tests
- Secondary injections
- Operational tests
- Verification of materials
Substation's Protection & Control system startup involves a series of meticulous steps to ensure that all systems operate correctly and interact properly with each other. This process includes verifying the functionality of protective relays, control systems, communication interfaces, and other related components.